2025 Pavement Maintenance Projects
The following planned projects are subject to budget, availability of labor and/or utility repair needs:
Overlays
Sturm Avenue – Aubin Road to Shelton RoadSturm Avenue – Studebaker Drive to Abbott RoadWoodland Avenue – Beginning at Abadie StreetPrincess Street – Kenwood Street to Hatch StreetKenwood Street – Electric Avenue to Rose StreetArtesia Street – Wildwood Street to Hatch StreetElectric Avenue – Kenwood Street to Myra Road
Grind/Inlay
Moore Street – 4th Avenue to 9th AvenueDivision Street – Alder Street to Whitman Street
Overlay/Reconstruct
-
Walla Walla Avenue – Wellington Avenue to Roosevelt Street
Strikethrough = work completed
Definitions
- Rebuild: Excavation of the existing street to the roadbed and the rebuilding of the road bed and surface layers of the street.
- Overlay: Application of a surface layer of asphalt or asphaltic concrete.
- Grind/Inlay: Grind 2" of existing asphalt and inlay new asphalt.
- Skin Pave: A thin asphalt lift is placed directly on pavement without any milling.
- Spot/Rut Repair: The damaged portion of the roadway is removed and the underlying issue(s) that cause the failure are remedied before the patch is replaced with new asphalt.
- Crack Sealing: The injection of hot tar or asphalt into cracks and paving seams.
- HMA: Hot mix asphalt