Updated: Nov. 4, 2025

2025 Pavement Maintenance Projects

The following planned projects are subject to budget, availability of labor and/or utility repair needs:

2025 Go Project Map 3.14.25

Overlays

  • Sturm Avenue – Aubin Road to Shelton Road
  • Sturm Avenue – Studebaker Drive to Abbott Road
  • Woodland Avenue – Beginning at Abadie Street
  • Princess Street – Kenwood Street to Hatch Street
  • Kenwood Street – Electric Avenue to Rose Street
  • Artesia Street – Wildwood Street to Hatch Street
  • Electric Avenue – Kenwood Street to Myra Road 

Grind/Inlay

  • Moore Street – 4th Avenue to 9th Avenue 
  • Division Street – Alder Street to Whitman Street 

Overlay/Reconstruct

  • Walla Walla Avenue – Wellington Avenue to Roosevelt Street 

Strikethrough = work completed

Definitions

  • Rebuild: Excavation of the existing street to the roadbed and the rebuilding of the road bed and surface layers of the street.
  • Overlay: Application of a surface layer of asphalt or asphaltic concrete.
  • Grind/Inlay: Grind 2" of existing asphalt and inlay new asphalt.
  • Skin Pave: A thin asphalt lift is placed directly on pavement without any milling.
  • Spot/Rut Repair: The damaged portion of the roadway is removed and the underlying issue(s) that cause the failure are remedied before the patch is replaced with new asphalt.
  • Crack Sealing: The injection of hot tar or asphalt into cracks and paving seams.
  • HMA: Hot mix asphalt