2024 Pavement Maintenance Projects
The following planned projects are subject to budget, availability of labor and/or utility repair needs:
Overlays
Garrison Street – Bush Street to Tausick WayWallace Street – Period Street to Berney DriveDelmont Street – Period Street to Berney DriveWildwood Street – Rose Street to Artesia AvenueDrumheller Street – Hatch Street to Offner Road
Skin Paves
Third Avenue – Maple Street to Tietan StreetOlive Street – Bridge Street to Wilbur AvenueEagan Street – 2ndAvenue to 3rdAvenueFirst Avenue – Locust Street to Thorne StreetLocust Street – 1st Avenue to Catherine StreetThorne Street/First Avenue – Thorne Street to Whitman Street
Crack Sealing
Rose StreetTriple Creek and Table Rock
Strikethrough = work completed
Definitions
- Rebuild: Excavation of the existing street to the roadbed and the rebuilding of the road bed and surface layers of the street.
- Overlay: Application of a surface layer of asphalt or asphaltic concrete.
- Grind/Inlay: Grind 2" of existing asphalt and inlay new asphalt.
- Skin Pave: A thin asphalt lift is placed directly on pavement without any milling.
- Spot/Rut Repair: The damaged portion of the roadway is removed and the underlying issue(s) that cause the failure are remedied before the patch is replaced with new asphalt.
- Crack Sealing: The injection of hot tar or asphalt into cracks and paving seams.
- HMA: Hot mix asphalt