Updated: Aug, 29, 2024

2024 Pavement Maintenance Projects

The following planned projects are subject to budget, availability of labor and/or utility repair needs:

2024 Go Projects (002) copy

Overlays

  • Garrison Street – Bush Street to Tausick Way
  • Wallace Street – Period Street to Berney Drive
  • Delmont Street – Period Street to Berney Drive
  • Wildwood Street – Rose Street to Artesia Avenue
  • Drumheller Street – Hatch Street to Offner Road

Skin Paves

  • Third Avenue – Maple Street to Tietan Street
  • Olive Street – Bridge Street to Wilbur Avenue
  • Eagan Street – 2nd Avenue to 3rd Avenue 
  • First Avenue – Locust Street to Thorne Street
  • Locust Street – 1st Avenue to Catherine Street
  • Thorne Street/First Avenue – Thorne Street to Whitman Street

Crack Sealing

  • Rose Street
  • Triple Creek and Table Rock

Strikethrough = work completed

Definitions

  • Rebuild: Excavation of the existing street to the roadbed and the rebuilding of the road bed and surface layers of the street.
  • Overlay: Application of a surface layer of asphalt or asphaltic concrete.
  • Grind/Inlay: Grind 2" of existing asphalt and inlay new asphalt.
  • Skin Pave: A thin asphalt lift is placed directly on pavement without any milling.
  • Spot/Rut Repair: The damaged portion of the roadway is removed and the underlying issue(s) that cause the failure are remedied before the patch is replaced with new asphalt.
  • Crack Sealing: The injection of hot tar or asphalt into cracks and paving seams.
  • HMA: Hot mix asphalt