Updated: September 28, 2023

2023 Pavement Maintenance Projects
The following projects are subject to budget, availability of labor and/or utility repair needs:
15th Avenue - Rees Avenue to Moore Street - 2" OverlayMoore Street - 15th Avenue to 13th Avenue - 2" OverlayCruthers Street - Rose Street to Dead End - 2" OverlayAnkeny Street - Whitman Street to Discovery Place - 2" OverlayAnnie Laurie Street - Rees Avenue to George Street - 2" OverlayBridge Street - Ruth Street south to project limits - Grind/InlayBowman Street - Dell Avenue to Elm Street - 2" OverlayWallowa Drive - Fern Avenue to Scarpelli Street - 2" OverlayNorth Rose Street - Pacific Avenue to Sumach Street - Grind/Inlay4th Avenue - Chestnut Street to Maple Street - Grindy/Inlay4th Avenue - Rees Avenue north to RR tracks - 2" OverlayGeorge Street - 4th Avenue to Jefferson Street - 2" Overlay
Crack Sealing
- Pleasant Street: Division Street to School Avenue
- Fern Avenue: Whitman Street to Reser Road
- Palouse Street: Rose Street to Mill Creek Bridge
- Park Street: Main Street to Boyer Avenue
- Moore Street: 2nd Avenue to Dead End
- Residential Streets: Between Chestnut Street and Alder Street. If completed move to between Alder Street and Isaacs Avenue
Strikethrough = work completed
Definitions
- Rebuild: Excavation of the existing street to the roadbed and the rebuilding of the road bed and surface layers of the street.
- Overlay: Application of a surface layer of asphalt or asphaltic concrete.
- Grind/Inlay: Grind 2" of existing asphalt and inlay new asphalt.
- Skin Pave: A thin asphalt lift is placed directly on pavement without any milling.
- Spot/Rut Repair: The damaged portion of the roadway is removed and the underlying issue(s) that cause the failure are remedied before the patch is replaced with new asphalt.
- Crack Sealing: The injection of hot tar or asphalt into cracks and paving seams.
- HMA: Hot mix asphalt